A restaurant is a kitchen with a dining room attached. The hood, the grease waste, and the health rules drive the job.
Draw the kitchen before you decorate the dining room
A restaurant is a kitchen that happens to have a dining room. The cooking line sets the power, the gas, the drains, the hood, and the floor. Chairs and lighting can wait. We have watched people pick tile for the dining room while nobody has found a path for the exhaust. That order is backwards. On a commercial construction job, the kitchen either fits the bay or the bay is the wrong bay.
Equipment is not a suggestion. A fryer, a charbroiler, a dishwasher, and a walk-in each ask for something the shell may not have. We need an equipment plan with electrical, gas, water, and waste called out, not a mood board. If the equipment is owner-supplied, the submittals still have to match the permit drawings. A cut sheet that arrives after the slab is patched is how floors get cut twice.
A hood is a path through the building
A hood is not a stainless box over the line. It is a listed assembly, a duct, a fan, a roof or wall penetration, and often a fire-suppression system under the grease hood. The duct has to have a route the structure can carry and the landlord will allow. A shaft through another tenant is not a field decision. If the only path is a guess drawn over the neighbors, stop and find another path or another suite.
Grease exhaust and heat or steam exhaust are not the same appliance. The mechanical designer sizes them and says which hood type the line needs. We do not pick that from a catalog in the truck. The roof curb has to land on structure, and it has to respect the existing roof warranty and the landlord’s roof rules. If a tenant improvement lease forbids roof penetrations, the hood may not have a legal path, and no dining-room finish will create one.
Grease waste has to leave the suite
Grease-laden waste does not go down a hand sink and it does not go down an ordinary floor drain into a sanitary line that was never meant for it. Cooking equipment that discharges grease needs a connection and an interceptor sized for the fixtures. Sizing belongs to the plumbing design and to the utility or reviewer who has to accept the tank. We do not publish a gallon size on this page. A number copied from another restaurant is how interceptors get rejected.
On the first walk we look for a place a tank can sit, a route for the pipe, and whether a tank is already in the ground for this bay or for the whole center. A shared tank that is full, undersized, or owned by someone who will not allow a new connection is a project problem. Patching concrete for a line that has nowhere to daylight is wasted work. Say so before the equipment is ordered.
Make-up air is part of the hood, not a comfort extra
Exhaust without make-up air pulls the front door open, starves the hood, and upsets the rest of the building. The make-up unit is sized with the hood, interlocked so it runs when the fan runs, and given a place to sit plus a duct path. Dining-room air conditioning is not a substitute. If the roof cannot take another curb, or the landlord will not allow one, the kitchen load has to change. We do not tell an owner the hood will breathe if they crack a window.
Make-up air also has to be tolerable for the people on the line. Dumping raw outdoor air on a cook in August is not a finished design. Tempering, location of the discharge, and noise are part of the mechanical sheets. If those sheets are blank, the hood is not designed yet. We will not rough in a fan and call the blank a detail for later.
The building permit does not license the food service
The building department reviews construction: structure, life safety, accessibility, mechanical, electrical, and plumbing. The agency that licenses the food service reviews how that business is set up to operate. Those are separate submissions. Which agency licenses a given food business depends on the kind of operation. We will not rename that into an Ocala health rule, and we will not invent a local checklist the authority has not written. Our page on the building permit is about the construction submittal only.
The scope should say which submission we coordinate and which one stays with the owner, the operator, or their kitchen consultant. Menu, equipment schedule, and the operating application are usually theirs. Passing a building final is not a food-service approval. A food-service comment is not a building permit. Opening the dining room to the public before both are actually done is not a gray area we will schedule.
Dining-room finishes that can take a service
Once the kitchen has a path, the dining room is still construction. Floors at the entry take rain. Seating has to leave the exit clear. Lighting has to work for the room and for the egress the new layout creates. Restrooms for the occupancy are not optional decoration. We build those from the permitted drawings. We do not design the menu, the line, or the way a server is supposed to move. That is the operator and the kitchen designer.
- Start from an equipment plan that names power, gas, water, and waste for each piece.
- Trace the hood duct to a roof or wall the structure and the landlord will accept.
- Find an interceptor location and a pipe route before the slab is cut.
- Size and interlock make-up air with the exhaust. Do not borrow dining-room air.
- Keep the building permit and the food-service approval as two submissions.
- Build the dining room after the kitchen path is real, not instead of it.
| Item | What has to be true | If it is not true |
|---|---|---|
| Hood path | A route for duct, fan, and curb that structure and the lease allow | The line cannot be exhausted, no matter how the dining room looks |
| Grease waste | A fixture connection and an interceptor the reviewer and the utility will accept | Waste has nowhere legal to go, and a copied gallon size will not fix it |
| Make-up air | A unit sized with the hood, with a place to sit and a duct path | The hood starves, doors stand open, and the rest of the building feels it |
| Fuel and power | Gas and electrical capacity for the actual equipment | Gear gets ordered that the service cannot feed |
| Approvals | A building permit and a separate food-service approval | One inspection gets mistaken for permission to serve the public |
If you are comparing bays, walk them with the equipment plan in hand, not with a seating chart. Call through contact when you want that walk. We will tell you if the hood, the grease waste, and the make-up air have a path. If they do not, we will say the suite fails before anyone prices banquettes.

Walk the bay with the equipment plan
Ocala Building Contractor is a disabled veteran-owned company with 17 years of construction in Ocala and Marion County. Call (352) 820-6068 before you lease a restaurant bay on the dining room alone. We will look for a hood path, a grease-waste route, and make-up air, and we will keep the food-service approval separate from the building permit.